Connect with us

Hi, what are you looking for?

Trading Tips

Resource Expansion Drilling Confirms 3,000 metres of New Uranium Trends with Best Drill Hole of 1.4 GT over 7.6 metres

American Uranium Limited (ASX:AMU, OTC:AMUIF) (American Uranium, AMU or the Company) is pleased to advise that 2025 resource expansion drilling at its Lo Herma ISR uranium project in Wyoming’s Powder River Basin (Lo Herma, the Project) has been completed according to plan with the drilling of 50 mud rotary holes for 53,460 feet (~16,300 metres).

The resource expansion drilling and recently completed pump testing program2 represent significant steps in the efforts to expand and upgrade the resource and validate aquifer transmissivity to support Lo Herma’s progression towards ISR mine development.

Highlights

Fifty (50) resource expansion drill holes, for ~16,300m (53,460ft), completed for 2025 Drilling confirms projected uranium mineralised trends north of proposed Mine Units 1 and 2 by up to 3000 metres (10,000 feet) from mineralised drill holes Best mineralised intercepts reported include 4.1m (3.5ft) at 0.078% (780ppm) eU308 containing 1m (3.5ft) at 0.143% (1,430ppm) eU308 in hole LH-25-048 Best total hole GT1 of 1.41 over 7.6m (25 ft) in 2 stacked sand units in LH-25-048 Planned Mineral Resource Estimate update and further drilling anticipated in 2026 Twelve (12) new mineral claims secured, totalling 96 hectares (238 acres) staked to extend the project north of proposed Mine Unit 2 Hydrogeologic and drilling programs aim to de-risk and advance the Lo Herma ISR Project towards a planned 2026 Scoping Study update

Speaking about the drill results, American Uranium’s CEO and Executive Director Mr Bruce Lane commented: “We are delighted that this resource expansion drilling has delivered strong grades with generous thicknesses in multiple stacked sands of both the Wasatch and the Fort Union formations. We remain very optimistic that the results of this expansion drilling campaign at Lo Herma can be brought into additional resource pounds. This year’s drilling has successfully demonstrated that the host sandstone units contain reliable continuity of mineralisation across extended trends for 3km (10,000ft) to the north of the current proposed mine units. With resource expansion drilling now completed for 2025, we look forward to the full geological evaluation of these results in early 2026 ahead of the next phase of drilling. Petrotek’s hydrogeological testing report is expected shortly which, along with the latest drilling data, will help guide the next steps of project development.

“AMU continues to both grow and de-risk the Project as we progress toward an update of the Lo Herma Scoping Study in 2026.”

Click here for the full ASX Release

This post appeared first on investingnews.com

    Stay updated with the latest news, exclusive offers, and special promotions. Sign up now and be the first to know! As a member, you'll receive curated content, insider tips, and invitations to exclusive events. Don't miss out on being part of something special.

    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    You May Also Like

    Sponsored Content

    No matter whether the stock market is moving up or down… Millionaire trader, Jeff Clark, finds a strategy that works. He almost doubled his...

    Sponsored Content

    Americans are paying more and getting less. On top of that, restaurants in California are now adding inflation fees to their bills… How crazy...

    Sponsored Content

    With inflation running at a 40-year high… And the stock market’s worst first-half since 1970… 1 out of 3 Americans has already tapped their...

    Trade Ideas

    Figure 1 TLRY iron fly on 13 September 2018 Options have infinite combinations but the classic hypothetical risk free trade is the credit spread...